Skip to content

How it works

From product idea to production-ready handoff.

Seven stages with clear outputs and approvals. Start from the stage you are at.

Phases
4 connected phases
Stages
7 stages, each with an output
First sample
7–14 business days
To production
Typically 6–10 weeks

01The process

Four phases. Seven stages. Clear checkpoints.

Every project is different. Some brands arrive with an idea or reference. Others already have a tech pack, approved sample, or production-ready product.

VI MADE starts from the stage you are actually in and scopes the Vietnam-side work still needed. You do not need to start from the beginning.

  1. 01Idea + NumbersDefine direction, quantity, target cost, timeline, and feasibility.
  2. 02Design + SampleTranslate the direction into a product, then test fit, construction, and materials.
  3. 03Production + QCMove the approved product through production and review agreed quality checkpoints.
  4. 04Package + HandoffPrepare finished goods for packing, shipment, and the agreed logistics handoff.
  • 01

    Have an idea?

    Bring a reference, moodboard, sketch, or product concept.

    Start at

  • 02

    Have a sample?

    We can review the current product and identify the next development or production step.

  • 03

    Have a tech pack?

    We can assess the Vietnam-side work required for sampling and production.

  • 04

    Already production-ready?

    We can scope production coordination, QC, packing, and shipment preparation.

02Seven stages

What happens, and what you approve.

  1. Illustrative product-development desk with blouse sketches, a brief sheet, fabric swatches, a pencil and an eraser
    Idea

    01Phase 01 · Idea + Numbers

    Idea

    Start with the product direction: an idea, reference, sketch, moodboard, sample, or tech pack.

    Output
    A clearer project brief that explains the product, customer, aesthetic direction, and what VI MADE needs to qualify next.
    Your decision
    Confirm the product direction and brief are clear enough to qualify costing and development.
  2. Illustrative materials table with olive and charcoal cloth, undyed fabric, a thread cone and a tray of zipper and buttons, with sewing stations and a rear-view worker behind
    Costing

    02Phase 01 · Idea + Numbers

    Costing

    Review numbers, feasibility, quantity, material direction, timeline, and production path before deeper studio work starts.

    Output
    Practical cost and feasibility context so the project can move forward with realistic expectations.
    Your decision
    Confirm the target cost, quantity, feasibility, and timeline are realistic enough to continue.
  3. Illustrative studio worktable with trouser patterns, a ruler, tailoring shears, fabric and a design notebook
    Design

    03Phase 02 · Design + Sample

    Design

    Turn references and ideas into a producible product direction with silhouette, construction, measurements, fabric, and trims.

    Output
    A sample-ready product direction that sample makers, suppliers, and factories can understand.
    Your decision
    Approve the silhouette, construction, measurements, and material direction that should move into sampling.
  4. Illustrative studio scene with Vi seen from behind and to the side, working on garment patterns beside fabric and sewing tools
    Sample

    04Phase 02 · Design + Sample

    Sample

    Coordinate sample making, review fit, construction, fabric choices, finishing, and revisions before production.

    Output
    A reviewed sample path with fit, construction, material, finishing, and approval issues made visible.
    Your decision
    Approve the fit, construction, materials, finishing, and recorded revisions before production.
  5. Illustrative cutting table with layered navy fabric, paper garment patterns, cut panels and a parked fabric cutter
    Production

    05Phase 03 · Production + QC

    Production

    Coordinate production after the sample, cost, quantity, materials, and timeline are approved.

    Output
    Vietnam-side production follow-up, factory communication, timeline tracking, and issue resolution during the order.
    Your decision
    Release the approved sample or specification, quantity, materials, and timeline into production.
  6. Illustrative inspection table with a pale-blue shirt laid flat, a narrow tape across the chest and a reference sheet, with sewing stations and a rear-view worker behind
    QC

    06Phase 03 · Production + QC

    QC

    Check products before they leave Vietnam and share visible quality updates through notes, photos, or videos where needed.

    Output
    Visible inspection notes, photo or video updates, quantity checks, measurement review, and issue reporting before dispatch.
    Your decision
    Review the agreed checkpoint results and any reported exceptions before packing and dispatch preparation.
  7. Packed parcels staged together and a parcel weight being verified before shipment handoff
    Package + Shipment Handoff

    07Phase 04 · Package + Handoff

    Package + Shipment Handoff

    Prepare finished products for retail handoff, confirm packing, labeling, carton, and weight details, and coordinate shipment readiness from Vietnam.

    Output
    Packed and labeled goods, verified carton and weight information, and a documented handoff ready for the agreed logistics provider.
    Your decision
    Confirm labels, packing, cartons, weight, destination, and the agreed logistics handoff before release.

03What happens at each stage?

The practical work behind each checkpoint.

The exact scope depends on the product and where it starts. A project may include some or all of the following.

01

Project inputs

  • Product category and customer context
  • References, sketch, sample, or tech pack
  • Target quantity, cost, and timeline
  • Material, trim, packaging, and destination needs

02

Development + approvals

  • Cost and feasibility direction
  • Design, construction, and measurement details
  • Pattern, sample, fit, and material review
  • Recorded approval before production

03

Vietnam coordination

  • Material and supplier follow-up
  • Partner workshop coordination
  • Factory communication and production tracking
  • Issue follow-up during the order

04

Checks + handoff

  • Agreed QC notes, photos, or video updates
  • Construction, measurement, and quantity checks
  • Packing, labeling, carton, and weight checks
  • Shipment readiness and logistics handoff

04Who is responsible for what?

A clear process starts with clear ownership.

VI MADE stays accountable for the agreed Vietnam-side scope without presenting partner workshops or logistics providers as one owned facility.

  • Your brand

    Owns the product direction, commercial targets, destination requirements, and approval decisions.

  • VI MADE

    Scopes the missing work, coordinates Vietnam-side activity, and keeps decisions, checkpoints, and handoffs visible.

  • Partner workshops

    Carry out the agreed pattern, sample, construction, and production work for the scoped product.

  • Logistics providers

    Handle external transit and destination services; the route and handoff responsibilities are confirmed for each shipment.

Start with your current stage

Tell us what you're building.

WhatsApp +84 947 819 629